9 — Morning of

Pre-class Checklist — T-60 min

TRAINER ONLY

Morning of · T-60 Step 9 of 9

NotePlatform smoke tests only

Projector, printed handouts, sign-in slides, and seating → Facilitator guide § Classroom logistics (T-30 min).

Morning of — platform verification (T-60 min)

    • Where: Launch workspaceCompute → Policies → Workshop · test with a trainee test accountCreate compute
    • Verify: Policy dropdown shows Workshop only (trainee group has Allow unrestricted cluster creation off — see § Entitlements); form loads (16.4 LTS / 15.4 LTS only); Standard runtime engine (no Photon). Trainer dry-run clusters (de-workshop-00_*) Terminated — attendee clusters appear only after they self-create in Module 2
    • Doc: Manage clusters
    • Where: Home → MHP-DE-Workshop-2026 → Git → Pull (branch main)
    • Where: Workspace → Users → <trainer> → MHP-DE-Workshop-2026 → Share
    • Verify: 5 notebooks; workshop_trainees_2026Can Run
    • Where: Catalog → mhpdeworkshop_databricks_2026
    • Where: SnowsightWarehouses → DE_WORKSHOP_WH → Resume
    • Where: Workspaces SQL file → LIST @TR_01_JUEWEI_SQL_BRONZE.nyc_taxi_trips_stage; (your trainer ID + _SQL_BRONZE schema)
    • Where: python streaming/snowflake/00_relay_consumer.py

Checklist complete — day-of runbook Facilitator guide § Before the room opens Classroom logistics + lead/co-trainer split (T-30)